Once the Party Wall Notice has been served then the next point of protocol is to undertake a
Schedule of Condition (SOC). The SOC is not a mandatory requirement under the Party Wall etc Act
1996 but has become widely adopted as a standard within the industry.

During the SOC inspection, the Party Wall Surveyor will inspect all elements of the adjoining owner’s
property that could be affected by the planned works, which contains a written and photographic
record of the condition of a property prior to the commencement of any proposed works. This is to
ensure that there is a thorough record of the condition of the adjoining owner’s property before the
planned works have commenced. This document is usually contained in a Party Wall
Agreement/Award.

 

A Party Wall Agreement sometimes referred to as a Party Wall Award is a statutory document drawn
up by a surveyor that stipulates certain terms and conditions that a building owner and/or adjoining
owner must abide by in order for works Under the Party Wall etc. Act 1996, to be carried out.

The Party Wall Agreement is usually compiled in three sections, these encompass; the Agreement
itself and contain a description of the permissible works; a Schedule of Conditions which contains a
written report with accompanying photographic evidence of the pre-work condition of the
properties that may be affected by the works, and; Drawings together with any additional
information such as planning permissions or an architect’s illustrations.

 

We can act as the Agreed Surveyor, appointed to act on behalf of both the Adjoining Owner and the
Building Owner intending to carry out the works.

Section 10 of the Party Wall Act 1996 explains the appointment of an Agreed Surveyor. It states that
when a dispute occurs, both parties will agree upon appointing one surveyor, or each party can
appoint his surveyor. If one surveyor is accepted and appointed by both parties, he will act as an
Agreed Surveyor.

The decision of his appointment is in the hands of the Adjoining Owner. Once the Adjoining Owner
assents to the appointment of the same surveyor, both parties mutually appoint an Agreed
Surveyor. An Agreed Surveyor is appointed to act objectively on the behalf of the owners.

 

Are you an Adjoining Owner who has been served a Party Wall Notice?

You are entitled to appoint an Adjoining Owners Party Wall Surveyor to represent your interests and
maintain the integrity of your structure and your rights during the course of the works, the cost of
which will be met by the building owner who has served notice and initiated the Party Wall et. Act
1996 as they’re the party proposing the works.

If you have been served a party wall notice it’s because your neighbour proposes to undertake
building works that are notifiable under the Party Wall etc. Act 1996 and could affect the areas of
your property adjacent to these works.

Notifiable works can involve works to a party wall or party wall structure, building a new wall up to
or astride the line of junction, or may involve excavations within 3m of your structure and to a depth lower than your existing foundations, or 6 meters of your property’s foundations at a 45-degree
angle.

 

If you are a Building Owner planning to carry out building works on your property that might be
covered by the Party Wall Act, you may need to serve notice to the Adjoining Owner or Occupier.

What must a Building Owner do to comply with the Party Wall Act?

As a Building Owner you must tell your neighbours in advance if you want to:
– Build on or at the boundary of your two properties
– Work on an existing party wall or party structure
– Excavate below and near to the foundation level of their building or structure

Your neighbour can’t prevent you from making changes to your property that are within the law.
However, they can affect how and when your works are carried out.
We advise at pre-planning stage on likely issues including where the Party Wall Act applies.

 

Under the Party Wall Act a building owner must serve a Notice before starting building works on an
existing party wall or near the boundary.

There is a statutory notice period of two months from the date the Party Wall Notice is served.
During this notice period works cannot start, unless your neighbour agrees to waive this period by
mutual consent.

The notice is only valid for a year, so it is also important that it is not served too early. Planning
permission for the work is not required before issuing a Party Wall Notice.

We always advise building owners to speak to their neighbours before serving a formal notice.
Neighbours that feel they are being consulted and kept informed are far less likely to immediately
appoint a surveyor when a notice is served.