Are you an Adjoining Owner who has been served a Party Wall Notice?

You are entitled to appoint an Adjoining Owners Party Wall Surveyor to represent your interests and
maintain the integrity of your structure and your rights during the course of the works, the cost of
which will be met by the building owner who has served notice and initiated the Party Wall et. Act
1996 as they’re the party proposing the works.

If you have been served a party wall notice it’s because your neighbour proposes to undertake
building works that are notifiable under the Party Wall etc. Act 1996 and could affect the areas of
your property adjacent to these works.

Notifiable works can involve works to a party wall or party wall structure, building a new wall up to
or astride the line of junction, or may involve excavations within 3m of your structure and to a depth lower than your existing foundations, or 6 meters of your property’s foundations at a 45-degree
angle.

 

Under the Party Wall Act a building owner must serve a Notice before starting building works on an
existing party wall or near the boundary.

There is a statutory notice period of two months from the date the Party Wall Notice is served.
During this notice period works cannot start, unless your neighbour agrees to waive this period by
mutual consent.

The notice is only valid for a year, so it is also important that it is not served too early. Planning
permission for the work is not required before issuing a Party Wall Notice.

We always advise building owners to speak to their neighbours before serving a formal notice.
Neighbours that feel they are being consulted and kept informed are far less likely to immediately
appoint a surveyor when a notice is served.